Build a Jamaican
data centre
Take a brief, design the campus and see if it passes.
Rooms and equipment
Campus
Where the design comes from
Room shapes illustrate this game. For engineering diagrams see the Vertiv OneCore data hall and service-room plan, the Pacific Northwest National Laboratory diagrams for compute and cooling connections, and the United States Department of Energy design guide. See Jamaican model sources.
Everyday power comparisons use the United States National Institute of Standards and Technology definition of a watt, a 20-watt Apple adapter, the Sharp microwave specifications, Golden Krust’s heating instructions and the United States Environmental Protection Agency vehicle rating.
Build timeline
The one-page PDF contains the baseline build report, not the operating-year simulation above.
Risks to check before building
How to read these flags and check the sources
“Priority check” flags a concern from your inputs. “Assumptions supplied” records an input for review. Caps on supplied water and electricity apply to the scenario. Site studies establish actual impacts, permits and outage risk.
- National Environment and Planning Agency of Jamaica. Air Quality Regulations, Wastewater and Sludge Regulations and protected areas.
- United States Department of Energy. Cooling tower water and discharge.
- Office of the Information Commissioner of Jamaica. Security, restoration and cross-border transfers.
- United States Cybersecurity and Infrastructure Security Agency. Cross-Sector Cybersecurity Performance Goals.
Adrian Dunkley