Test the Portmore numbers.
Set a jobs target and the terms a customer or supplier will offer. Compare the return, the local jobs and the demand for water and power. All money figures are in constant 2026 US dollars.
The reference case assumes independent electricity and a water source that can meet Cabinet’s conditions. An entry here cannot establish that a supplier or parcel qualifies.
What the inputs imply
NPV is net present value. A positive result clears the required return. A full-time equivalent (FTE) is the work of one person on a full-time schedule.
Reference case. At 65% local hiring, 13 operating FTEs yield 8.45 resident FTEs against a target of 20.
One trial changes demand, prices, construction cost, the price of power, the rate of GPU price decline and disruption. The model links higher demand with better prices. The low and high values bracket the middle 90% of simulated results. All 10,000 trials use the same random seed on each run, so you can compare your choices.
Read the assumptions and source notes · Download the code and data